Skip to content
All The Way Up

HALTON
& PEEL.

02 / 08

Second-storey additions, basements and backyard builds across Oakville, Burlington, Milton, Mississauga, Brampton and Caledon.

New two-storey family home
(01) — What we do here

MOST ASKED FOR.

All services →

Second-storey additions on bungalows and split-levels, rear additions, garages, and new homes on rural lots in Caledon, Milton and Halton Hills.

New homesAdditionsRoof framing & roofingGarages & outbuildingsRenovations & structural
Explore Build & structure →

Decks, porches, retaining walls and hardscaping — including sloped and ravine-backed lots where grading and drainage need care.

Decks & porchesDocks & boathousesHardscaping & stamped concreteRetaining wallsLandscaping & waterfalls
Explore Outdoor & waterfront →
(02) — Building here

LAKESHORE TO ESCARPMENT.

Halton and Peel run from the Lake Ontario shoreline in Oakville, Burlington and Mississauga up to the Niagara Escarpment and the rural lots of Milton, Halton Hills and Caledon. The housing ranges just as widely: post-war bungalows and 1970s split-levels in the south, newer subdivisions across Milton and Brampton, and farm and estate properties in the north.

Many of the older homes in the south sit on lots with room to grow, which makes them good candidates for second-storey and rear additions. Bungalows and split-levels often need structural work to carry a new floor, so we check the existing foundation and framing before an addition is drawn.

Above the escarpment, the Niagara Escarpment Commission controls development in its plan area, and many rural properties in Caledon, Milton and Halton Hills run on wells and septic systems. Both affect what can be added and where, so they’re part of the plan from the start.

(03) — Permits & approvals

PLANNED AROUND APPROVALS.

Building permits come from the local municipality — Oakville, Burlington, Milton, Halton Hills, Mississauga, Brampton or Caledon. Near creeks, valleys and the lake, Conservation Halton, Credit Valley Conservation or the Toronto and Region Conservation Authority may also need to approve the work, and the Niagara Escarpment Commission issues its own development permits in the escarpment area.

Conservation authorities
Conservation HaltonCredit Valley ConservationToronto and Region Conservation Authority
(04) — Towns we cover

CLOSE TO HOME.

Check your town →

Halton Region

Burlington · Oakville · Milton · Halton Hills · Georgetown · Acton

Peel Region

Mississauga · Brampton · Caledon · Bolton
(05) — Questions

ASKED
OFTEN.

More questions →

Do I need Niagara Escarpment Commission approval?

Only if your property is inside the Niagara Escarpment Plan’s development control area, which takes in parts of Burlington, Milton, Halton Hills and Caledon. There, most new buildings, additions and site grading need a development permit from the Commission as well as a municipal building permit.

Can my bungalow take a second storey?

Often, but not always as it stands. The foundation and walls have to carry the new load, and the zoning by-law limits height and floor area. We look at the existing structure and the zoning before design, so you know early whether reinforcement or a variance is needed.

Do I need a permit for a basement apartment in Brampton?

Yes. A second unit needs a building permit, and Brampton also requires second units to be registered with the city. The unit has to meet the building and fire codes, and we handle the drawings and the permit application as part of the job.

(Next) — Start a project

BUILDING
NEAR YOU.

Send the plans, a sketch or just an idea. We'll scope the job and come back with a straight, itemized quote.